Electrical Power Distribution Unit Power Distribution
Home Career Login: view Invoices and paymentsLogin FAQ's Contact Us Feedback Site Map   
 
Button Image: Click to know about the company
Button Image: Click here to know about online service of the company
Button Image: Click here to know about the knowledge Center of the company
Button Image: Click here to know about Commercial Information of the company
Button Image: Click here to know about the Help at hand
Button Image: click here to know about Announcement of the company
Icon Image: Calculate Load How to Calculate
Consumption and Load
Icon Image: Download Forms Download Forms
Regulatory Filing
  Guidelines for Network design
  Public Information
New Connection

New Connection

 
 
   Getting Started
 
For a new connection, you are required to fill up theApplication Form and submit it at the Head Office along with necessary documents. In case any help is needed, the person staffing the Reception Counter will be glad to be of assistance to you.
 
   Apart from the Application Form, your application should contain the following documents:
 
Customer Category Document Required
Urban Possession Letter
Industrial

B&L Form
SSI Registration (in case of Small Scale Industries)

Agricultural Kisan Bahi copy - as proof of ownership
B&L Form
No Objection Certificate from other owners of Tube well
 
 
   Follow Through
 
  • Once you have submitted the above documents, make sure you have collected an acknowledgment of receipt of the Form from the Reception.
  • In case installation or alteration of service required, an inspection along with verification for previous outstanding dues may be carried out at site.
  • Kindly ensure that you or your accredited representative is present at the site during the inspection.
  • A provisional Offer-cum-Bill stating the terms and conditions for acceptance of your application and details of charges involved, shall be issued at the Head Office.
  • You are required to kindly deposit the amount mentioned in Offer-cum-Bill to the Cashier at the Head Office.
  • After all necessary terms and conditions are complied with; installation/alteration of connection will be carried out.
  • Meter will then be fixed and sealed and supply subsequently energized.
 
  Home Link separator of top navigation Login Link separator of top navigationFAQ'sLink separator of top navigation Contact UsLink separator of top navigation FeedbackLink separator of top navigation Site Map